Skip to main content

How to Replace a Transition Strip (T Molding)

What you need

  1. How to Replace a Transition Strip (T Molding), Transition Strip (T Molding): step 1, image 1 of 1
    • Measure the exact width of the doorway using a tape measure.

  2. How to Replace a Transition Strip (T Molding): step 2, image 1 of 3 How to Replace a Transition Strip (T Molding): step 2, image 2 of 3 How to Replace a Transition Strip (T Molding): step 2, image 3 of 3
    • Mark the T molding based on the doorway measure.

    • Cut the T molding using a sharp saw (table saw).

    • Cutting the T molding can be done for free at the place of purchase.

    • If you don't have access to a sharp saw, cut the T molding using a jigsaw and use sanding paper to soften the end.

  3. How to Replace a Transition Strip (T Molding): step 3, image 1 of 3 How to Replace a Transition Strip (T Molding): step 3, image 2 of 3 How to Replace a Transition Strip (T Molding): step 3, image 3 of 3
    • Remove the old T molding.

    • You can use a pry bar to loosen the T molding.

  4. How to Replace a Transition Strip (T Molding): step 4, image 1 of 2 How to Replace a Transition Strip (T Molding): step 4, image 2 of 2
    • Use a utility knife to remove all the glue or any material used to keep the old T molding in place.

    • You may use a scraper instead of a utility knife.

    • Clean up the area thoroughly.

  5. How to Replace a Transition Strip (T Molding): step 5, image 1 of 1
    • Apply the glue evenly to the gap.

  6. How to Replace a Transition Strip (T Molding): step 6, image 1 of 3 How to Replace a Transition Strip (T Molding): step 6, image 2 of 3 How to Replace a Transition Strip (T Molding): step 6, image 3 of 3
    • Insert the T molding into the gap.

    • Press the T molding firmly onto the ground.

    • No gap should exist between the T molding and the floorings.

  7. How to Replace a Transition Strip (T Molding): step 7, image 1 of 2 How to Replace a Transition Strip (T Molding): step 7, image 2 of 2
    • Tape the T molding onto the floor.

    • This step ensures the T molding stays in place until the glue dries.

    • Wait 24 hours for the glue to dry.

    • Remove the tapes.

Conclusion

To reassemble your device, follow these instructions in reverse order.

Rojean Noorinayer

Member since: 05/12/21

145 Reputation

1 Guide authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 6

Past 7 Days: 49

Past 30 Days: 175

All Time: 4,394