Installation Instructions
Publication Part No. 1C0935 9/93 10/82
Supersedes 632733
HEALTH SCIENCES
yemem ee
WARNING
To avoid hazardous conditions, keep floors and floor coverings around your Kodak X-Omat Processor and associated drains clean and dry at all times. Any accumulation of fluids from mixing tanks, drain lines, etc., should be cleaned up immediately. In the event of an accumulation of liquid due to backup, overflow, or other malfunction of the drain associated with your X-Omat Processor, call a plumber or other contractor to correct any problem with your drain. Kodak accepts no responsibility or liability whatsoever for the serviceability of any drain connected to or associated with a Kodak X-Omat Processor. Such drains are the sole responsibility of the customer.
This equipment includes parts and assemblies sensitive to damage from electrostatic discharge. .Use caution to prevent damage during all service procedures.
TABLE OF CONTENTS
| Procedure | Description | Figure | Page |
|---|---|---|---|
| Removal of the RACK ASSEMBLIES from the Cartons | P | 5 | |
| Moving the PROCESSOR onto the MOUNTING STAND | © | 6 | |
| Installing the FILM GUIDE ASSEMBLY | 7 | ||
| Installing the LIGHT-LOCK GASKET | OB | 8 | |
| Adjusting the LEVELING SCREWS , | 9 | ||
| Installing the WALL-MOUNTING BRACKETS | NO | 10 | |
| Making the ELECTRICAL CONNECTIONS | 8,9 | 11,12 | |
| Making the WATER and DRAIN CONNECTIONS | 10 | 13 | |
| SOMNODAWN= | Making the EXHAUST CONNECTIONS | 11 | 14 |
| Making the Connections from the REPLENISHER TANKS to the REPLENISHER PUMP | 12 | 15 | |
| Checking the Operation of the PROCESSOR | 13 | 16 | |
| Checking the Replenishment Rates | 14,15 | 17,18 | |
| Adjusting the Replenishment Rates | 16 | 19 | |
| Installing the RACK and CROSSOVER ASSEMBLIES | 17 | 20 | |
| Checking the Operation of the DETECTOR SWITCH ASSEMBLIES | 18 | 21 | |
| Adjusting the DETECTOR SWITCH ASSEMBLIES | 18 | 21 | |
| Checking the Operation of the ACCESSORY SAFELIGHT and the BUZZER | 19 | 22 | |
| Checking the Temperature of the Developer | 20 | 23 | |
| Adjusting the Temperature of the Developer | 21 | 24 | |
| Installing the EVAPORATION COVERS and the SEPARATION COVER | 2 | 25 | |
| Adjusting the 'Clear Time' | 23 | 26 | |
| Installing the DEVELOPER FILTER CARTRIDGE | 24 | 27 | |
| Filling the TANKS with Chemicals | 25,26,27,28 | 28,29,30,31 |
Table Caption: This table outlines the procedures for installing and checking a processor, including details on connections, assemblies, and chemical filling, with corresponding figure references and page numbers.
NOTE Use qualified personnel to install the PROCESSOR.
Table Caption: This table provides a disclaimer from Eastman Kodak Company regarding the information presented, stating it's based on their prior experience and knowledge, grants no patent license, and is subject to change without notice, with Kodak disclaiming liability for any damages.
IMPORTANT
Check that you have ail the parts below before you start the installation.
Table Caption: This table lists parts, their part numbers, quantities, and associated figure numbers, organized into envelopes.
4
(D) Deleted (R) Revised 100935
©
©
©
©