Skip to main content
Preview of the first page of this document

Log in to view the full document

32 pages · 1,021.94 kb · PDF

Log In

Installation Instructions

Publication Part No. 1C0935 9/93 10/82

Supersedes 632733

HEALTH SCIENCES

yemem ee

WARNING

To avoid hazardous conditions, keep floors and floor coverings around your Kodak X-Omat Processor and associated drains clean and dry at all times. Any accumulation of fluids from mixing tanks, drain lines, etc., should be cleaned up immediately. In the event of an accumulation of liquid due to backup, overflow, or other malfunction of the drain associated with your X-Omat Processor, call a plumber or other contractor to correct any problem with your drain. Kodak accepts no responsibility or liability whatsoever for the serviceability of any drain connected to or associated with a Kodak X-Omat Processor. Such drains are the sole responsibility of the customer.

This equipment includes parts and assemblies sensitive to damage from electrostatic discharge. .Use caution to prevent damage during all service procedures.

TABLE OF CONTENTS

ProcedureDescriptionFigurePage
Removal of the RACK ASSEMBLIES from the CartonsP5
Moving the PROCESSOR onto the MOUNTING STAND©6
Installing the FILM GUIDE ASSEMBLY7
Installing the LIGHT-LOCK GASKETOB8
Adjusting the LEVELING SCREWS ,9
Installing the WALL-MOUNTING BRACKETSNO10
Making the ELECTRICAL CONNECTIONS8,911,12
Making the WATER and DRAIN CONNECTIONS1013
SOMNODAWN=Making the EXHAUST CONNECTIONS1114
Making the Connections from the REPLENISHER TANKS to the REPLENISHER PUMP1215
Checking the Operation of the PROCESSOR1316
Checking the Replenishment Rates14,1517,18
Adjusting the Replenishment Rates1619
Installing the RACK and CROSSOVER ASSEMBLIES1720
Checking the Operation of the DETECTOR SWITCH ASSEMBLIES1821
Adjusting the DETECTOR SWITCH ASSEMBLIES1821
Checking the Operation of the ACCESSORY SAFELIGHT and the BUZZER1922
Checking the Temperature of the Developer2023
Adjusting the Temperature of the Developer2124
Installing the EVAPORATION COVERS and the SEPARATION COVER225
Adjusting the 'Clear Time'2326
Installing the DEVELOPER FILTER CARTRIDGE2427
Filling the TANKS with Chemicals25,26,27,2828,29,30,31

Table Caption: This table outlines the procedures for installing and checking a processor, including details on connections, assemblies, and chemical filling, with corresponding figure references and page numbers.

NOTE Use qualified personnel to install the PROCESSOR.

Table Caption: This table provides a disclaimer from Eastman Kodak Company regarding the information presented, stating it's based on their prior experience and knowledge, grants no patent license, and is subject to change without notice, with Kodak disclaiming liability for any damages.

IMPORTANT

Check that you have ail the parts below before you start the installation.

Table Caption: This table lists parts, their part numbers, quantities, and associated figure numbers, organized into envelopes.

4

(D) Deleted (R) Revised 100935

©

©

©

©

2 Moving the