Changes to this Step
Edit by Ashley m. Wuthrich -Hoffman —
Edit approved by Ashley m. Wuthrich -Hoffman
- Before
- After
- Unchanged
Step Lines
+ | [* black] Adjust according to the the pipe in the wall. The pipes should be aligned to screw the nuts back on. |
---|---|
+ | [* black] Once pipes are aligned screw the nuts tightly. The pipe should be reassembled. |
+ | [* black] Tighten all loose nuts. |
Image 1
No previous image
Added
Image 2
No previous image
Added