Skip to main content

Changes to Step #2

Edit by Tiny Machines 3D

Edit approved by Tiny Machines 3D

Before
After
Unchanged

Step Lines

-[* orange] With the grommet loose, you can feed the 2 and 3 pin connector through the grommet and feed it through the hole in the rear of the control box.
+[* orange] With the grommet loose, you can feed harness A through the grommet with the 2 and 3 pin connector going first.
+ [* icon_note] Feed it through the hole in the rear of the control box.
[* light_blue] Leave 4-5 inches of the loose pins and reinstall the grommet.
-[* black] Make sure the grommet is fully seated into the hold.
+[* icon_note] Make sure the grommet is fully seated into the hold.