Introduction

Here's a step-by-step tutorial to dismount each piece of the NAS until you reach the motherboard.

'Note: the interest of this tutorial is however limited.'

Indeed, most of the components that a user can be brought to add or change are now accessible directly, without disassembly (storage disks, memory expansion, SSD cache).

This is a step forward since, for example, a DS415 + / DS916 + must be completely removed to change a single RAM array.

Only the memory stack on the motherboard and fans remain inaccessible directly and require the disassembly of the NAS described in this tutorial to be changed (whether they are HS or replace them not the best).

The dismantling time is estimated at one hour (a single experiment on the meter). That said, it is certainly achievable in 20/30 minutes.

The photographs were taken with a CANON EOS 7D and an iPhone SE, using a portable LED studio.

Parts

No parts required.

Here are the different interesting faces of the case: front (bay disks), rear (connectors and fans), below (2 hatches SSD).
  • Here are the different interesting faces of the case: front (bay disks), rear (connectors and fans), below (2 hatches SSD).

  • This NAS DS918 + is equipped with 4 GB of RAM (8 GB max.), An INTEL Celeron J3455 64-bit Quad processor, four bays for SATA drives.

    • 2 RJ45 Gb ports.

    • Kensington security incision (K-lock)

    • 2 M.2 NVMe 2280 ports (disk cache)

    • 1 port for power supply

    • 2 USB 3 ports (1 in front and 1 behind)

    • 1 eSATA port

Add Comment

Before teardown, unlock the disk media with the key.
  • Before teardown, unlock the disk media with the key.

Add Comment

  • Since the media are unlocked, remove each disk media.

Add Comment

  • This is a significant innovation, the memory is now directly accessible and without disassembly of the housing, for the original bar as for the extension port.

Add Comment

  • Remove the 2 screws on the back of the case at the top and bottom (not the one above the USB port)

Add Comment

  • Slide the cover forward, then slide it out (here, to the left).

Add Comment

  • in red: SSD M.2 expansion card 2280

  • in yellow: USB port 3

  • in orange: internal connectors of the 2 fans

  • in green: 2 slots of RAM

  • in blue: SATA III backplane (4 hard drive bays)

  • in pink: fixing the fans on the chassis

Add Comment

  •   Remove the 4 screws located on the blue electronic board.  

  • You can remove the M.2 expansion board now.

Add Comment

  • Remove the screw from the holding plate of the USB connector 3.

  • Also remove the USB 3 connector screw on the rear side (this can be done later).

  • Do not remove the USB connector 3 on the motherboard, it is glued. It does not interfere with disassembly!

Add Comment

  • Remove the screws from the two shims to secure the disc cage and the two fans.

Add Comment

  • 5 Phillips screws must be removed.

  • First 3 screws on SSD expansion board, on the bottom (bottom).

Add Comment

  • Then 2 screws on the upper face of the device (top).

Add Comment

  • Now that the screws have been removed, you can (after verification) remove the cage drives.

  • Attention to the backplane and its connector (the electronic card). Check and check again, without forcing! The cradle discs must come alone.

Add Comment

  • Remove the 8 screws from the fan grilles. They make it possible to maintain both the grilles and the fans.

  • Removing the fans does not seem necessary (not taken the time to check) to remove the motherboard.

  • Attention, when it comes to reassemble the grids, it will be necessary to make sure to align the 2 very small lugs in relief on the back of the plastic grates with the 2 small holes between the screws of the bottom of the fans!

Add Comment

  • According to the technical documentation of Y.S. TECH:

  • Voltage: 12 Vdc (7 to 13.2 range) for 100 mA (consumption)

  • Life time @ 40 ° C L10: 50000 h

  • Noise level: 23 dB

  • Max airflow: 36.3 cubic feet / minute

  • Rotation speed: 1900 rpm

  • Weight: 100 g

Add Comment

  • Remove the power cables from the fans, being careful to locate them (you never know) located on the motherboard.

  • Then remove the fans.

  • You will also be careful to unscrew the USB 3 connector fixing screw on the rear panel (if this has not been done previously).

Add Comment

  • Remove the 4 screws that secure the motherboard to the case.

  • Remove the motherboard from the case paying attention to the USB 3 connector on the front and the power button. To do this, move the front panel a little and lift the motherboard upwards (outside).

  • Once the motherboard is out, unscrew the 4 screws of the metal protective cover (metal plate).

Add Comment

  • Motherboard processor face

    • INTEL Celeron J3455 / 64-bit / Quad core 1.5 burst up to 2.3 GHz

    • Memory battery

    • Internal Beep

    • USB connector 3

    • Power button (power-on)

    • Flash memory with pre-loaded DSM 6.1 kernel to allow the NAS to boot before full installation of the OS

    • UEFI Insyde H2O BY56 chip ??

Add Comment

  • Memory side of the motherboard (pre-equipped with 4 GB of RAM)

    • NVMe M.2 SSD expansion card connector

    • Connector (PCIe ??) for SATA disk expansion card

    • Fan connector (x2)

    • Power connector

    • RJ45 LAN Connector (8P8C) x2

    • ESATA connector

  • Original 4GB DDR3L RAM Memory Stick 1866

Add Comment

Conclusion

To reassemble your device, follow the instructions in reverse order.

Be careful however, for the grilles of the fans it will be necessary to make sure to align the 2 small raised lugs on the back of the plastic grates with the 2 small holes between the screws of the bottom of the fans!

6 other people completed this guide.

Special thanks to these translators:

100%

These translators are helping us fix the world! Want to contribute?
Start translating ›

Sébastien

Member since: 12/14/2015

598 Reputation

3 Guides authored

Team

AEM (ANIMA EX MACHINA) Member of AEM (ANIMA EX MACHINA)

Business

1 Member

6 Guides authored

2 Comments

Un tutoriel complet, avec de bonnes photos, lecture claire et concise.

Bravo et merci pour ton travail.

Jordi Chavarria - Reply

merci pour ces encouragements !

Sébastien -

Add Comment

View Statistics:

Past 24 Hours: 18

Past 7 Days: 99

Past 30 Days: 380

All Time: 4,181